westline supply

Steel cut to your drawings, on the same truck as its hardware.

Westline Supply stocks #3–#8 rebar, angle, channel, tube, flat bar and plate, along with the hurricane ties, holdowns, anchors and bolts that hold them together. There is no minimum order. Email a bar list from Lindsay to Fresno and the cut pieces, the connectors and the anchor epoxy arrive together, packed by phase and labeled for the crew.

Close view of steel reinforcing bars stacked side by side

One order, one truck, one label per phase.

Most small jobs lose half a morning to the gap between suppliers: the steel yard has the rebar, the hardware counter has the ties, and the fabricator has the bent bars somewhere in a queue. We close that gap by putting all three on a single order. Each phase of your job gets its own manifest, its own boxes and its own delivery date, and the label on the box matches the line on your invoice.

The sample manifest is illustrative: it shows how a shearwall and roof-tie phase on a two-story house might be packed.

Illustrative product interface

What a contractor should ask a steel supplier before the first order

These are the questions that come up on the first call, usually in this order. The answers are the same ones you would get by email, and the numbers behind them are on the Rates page.

Ordering

What you can buy, and how little of it.

Is there a minimum order?

No. We sell rebar by the stick, angle and tube by the length, and connectors by the piece or the box. A welding shop that needs three 20 ft sticks of 2 x 2 x 3/16 in. tube gets the same quote process as a framer ordering a full phase of holdowns. We do not sell full mill bundles or truckloads for large commercial and infrastructure work; that trade belongs to mill-direct suppliers.

Which steel sizes do you keep on hand?

Rebar from #3 through #8 in Grade 60, plus the angle, channel, square and rectangular tube, flat bar and plate sizes that small residential, ag and light commercial jobs actually call for. If a size on your drawings is outside our regular stock, we source it and tell you the lead time before you commit.

Can you match the connectors on my plans?

Send the plan sheet or schedule and we will pick the hurricane ties, holdowns, hangers, straps and anchors it names, with the fasteners the manufacturer requires. If an item is out of stock we can propose an equivalent, but a substitution on a structural connector goes to your engineer of record for approval first. We do not make that call for you.

Cutting & kits

What happens between the rack and your truck.

What do I send for cut-to-length work?

A bar list, a cut list, or the drawing itself as a PDF. We read bar marks, quantities and lengths directly from it, confirm anything ambiguous by email, and cut on our saw and shear. Bends, holes and anything else beyond a straight cut go to a partner fabricator nearby and come back to ride with the rest of your order.

What exactly is a phase kit?

One labeled box or bundle per construction phase or area: the connectors, anchors, bolts and small hardware for, say, the second-floor shearwalls, packed against your takeoff and marked with the job name and phase. Kits arrive when that phase is about to start, so the crew is not digging through a pallet for the right holdown.

How long does cutting take?

Straight cuts from stock are usually ready in one to two business days. Work that goes to a partner fabricator for bending or drilling typically adds three to five business days. Your quote states the date, and if it moves, you hear from us before the morning it was due.

Pricing & accounts

Why steel prices move and service fees do not.

Why does your steel price change between quotes?

Because the market does. Steel is priced off the day's market, and hot-rolled coil has swung by hundreds of dollars a ton within a single year. Stock quotes hold for seven days. Cutting, kitting and delivery fees are fixed and published on our Rates page.

Do you offer Net 30 terms?

Yes, after a credit application is approved. Account pricing runs about two percent above cash pricing, which covers the cost of carrying the invoice. Until the account is open, orders are paid by card or check before release.

Can you lock a price for a whole project?

For mid-sized residential, agricultural and light commercial jobs, we quote the full material list and sign a supply contract for the schedule. Steel lines carry an adjustment clause tied to a published index, so neither side carries a surprise; connectors, block and hardware hold for the contract term.

Delivery

Where the truck goes and what it costs.

Where do you deliver?

Tulare, Kings and Fresno counties, from Lindsay. Jobsites within 25 miles ride free; beyond that we add a per-mile charge that shows on the quote before you approve it. You can also pick up at Lindsay by arrangement.

Can I get stock material the same day?

Stock items ordered by 10 a.m. on a business day can usually reach jobsites inside the free radius that afternoon. Cut and kitted orders follow the dates on your quote.

Do you install or weld?

No. We do not do structural design, calculations or stamped drawings, and we do not install or weld on site. We supply, cut and deliver the material; your crew and your engineer own the work in place.

Have a bar list on your desk right now?

Attach it, with the jobsite address and the date the crew needs material, and we will reply within one business day with a priced quote, the cut dates and the delivery plan. If something on the list is unclear, we ask instead of guessing.