What happens after you hit send?

Six steps, and most small orders move through all of them inside a week. The point of writing them down is that you always know which step you are in, what we are waiting on, and which of the two of us owes the other an answer. Delays on a jobsite rarely come from steel; they come from nobody knowing who was supposed to call.

Work truck loaded with building materials parked beside a building
  1. 01

    You email the list

    Everything begins with a message to our inbox. A bar list, a connector schedule, a plan sheet or a handwritten cut list photographed on a tailgate all work, as long as quantities and sizes are legible. We read it the day it arrives.

    What we need from you

    Drawings or lists as PDF or photo, the jobsite address, and the date the crew needs material.

    How long

    Same business day acknowledgment.

  2. 02

    We check the takeoff and quote

    We match every line to stock, flag anything we would have to special-order, and ask about marks that do not add up. The quote separates material at today's price from fixed fees for cutting, kitting and delivery, and it states the date each phase can ship.

    What we need from you

    Answers to any questions on the list, and your preferred phase breakdown if you want kits.

    How long

    Within one business day for stock orders; 2–4 business days for full project lists.

  3. 03

    You approve and pay or open terms

    Approve by reply. Cash customers pay by card or check before release. If you want Net 30, we send a credit application with the quote; project supply customers sign a supply contract that sets out the schedule and the steel adjustment clause.

    What we need from you

    Written approval, payment or a completed credit application, and a PO number if you use them.

    How long

    Credit applications are usually decided in 2–3 business days.

  4. 04

    We cut, tag and kit

    Straight cuts go on our saw and shear. Bends and holes go to a partner fabricator and come back to us. Connectors and hardware are picked against your list and packed into labeled phase kits. Nothing ships until the count matches the quote.

    What we need from you

    Nothing, unless a drawing changes. Send revisions as soon as you have them; cut pieces cannot be uncut.

    How long

    1–2 business days for straight cuts; 3–5 for bending or drilling.

  5. 05

    We deliver to the jobsite

    Each delivery carries one phase. The driver unloads, the packing list travels with the kits, and we email a delivery ticket the same day. Sites within 25 miles of Lindsay are delivered free; beyond that the per-mile charge was on your quote.

    What we need from you

    Clear access for a flatbed and someone to sign the ticket.

    How long

    On the date set in your quote or schedule.

  6. 06

    After delivery

    Count against the ticket and tell us about any shortage or damage within seven days. Shorts ship on the next run at no charge. If you are running several jobs, we can manage a jobsite stock of common items and refill it on a set schedule for a monthly fee.

    What we need from you

    Photos and the ticket number for any shortage or damage claim.

    How long

    Shortages replaced on the next scheduled delivery.

On a project, the calendar is the contract.

Project supply follows the same six steps, stretched over months. After the contract is signed we agree a delivery calendar with your superintendent, one row per phase, and we hold to it. When the slab slips a week, you email us and every row behind it moves; nothing arrives early to sit in the dirt.

Each batch is invoiced on delivery, so your payables track the work in place rather than the full material list on day one.