westline supply

A bar list is a promise. We cut to it.

Everything we sell starts as stock on a rack and ends as a labeled piece on your jobsite. Between those two points sit five services, and each is written up below the same way: what it covers, what it does not, what you receive, and roughly how long it takes. If a line does not fit your job, the honest answer is usually in the "not included" column.

Stock steel and rebar, sold by the stick

Mills ship rebar in bundles of 20, 40 or 60 ft bars, which is exactly the problem for a crew that needs eighteen of them. We break those bundles. Rebar from #3 to #8 in Grade 60, plus angle, channel, square and rectangular tube, flat bar and plate in the sizes that small structures use, are sold by the piece, the bundle or the ton, for pickup in Lindsay or delivery to the jobsite.

Not included: epoxy-coated or galvanized rebar from stock (we special-order it and quote the lead time), and full-truckload mill orders. Delivered as: straight lengths or cut pieces, tagged. Timing: same day for stock ordered by 10 a.m. inside the free delivery radius.

Metal bars, tubes and pipes stored on industrial shelving

Rebar we keep in stock

Nominal weights per the standard ASTM bar sizes. Use them to check a bar list against a delivery ticket.

Bar Diameter lb / ft lb / 20 ft stick
#3 3/8 in. 0.376 7.5
#4 1/2 in. 0.668 13.4
#5 5/8 in. 1.043 20.9
#6 3/4 in. 1.502 30.0
#7 7/8 in. 2.044 40.9
#8 1 in. 2.670 53.4

Grade 60 is our stock grade. ASTM A706 weldable bar is available by special order. Rebar chairs, slab bolsters and tie wire ship with the bar.

Metal bar being cut with a saw, sparks flying across a workshop

Structural connectors and fasteners

The small parts that make a load path, counted against your plan.

Hurricane ties, holdowns, joist and beam hangers, straps, connection plates, mechanical and adhesive anchors, and structural bolts, sold by the piece or the box. Typical lines include ties such as the Simpson Strong-Tie H2.5A (18 ga, G90, ZMAX or stainless) and adhesive anchoring with SET-3G epoxy in 8.5, 22 and 56 oz cartridges. Older holdown series that manufacturers have discontinued, such as the HDU line now replaced by HDUE, are flagged on your quote so your plans and your order agree.

Included
Picking from your plan schedule, the fasteners the manufacturer specifies for each connector, and the evaluation report numbers (ESR) for your submittal when you ask.
Not included
Choosing connectors for you or approving substitutions. Any swap goes to your engineer of record first.
What you receive
Boxed and counted connectors, invoiced line by plan mark.
Typical timing
Stock items same day or next business day; special orders quoted with a date.

Cut-to-length and light fabrication

Your bar list, cut on our saw, with bends and holes from a local partner.

We cut rebar, angle, channel, tube, flat bar and plate to the lengths on your bar list, cut list or drawing. Straight cuts happen in-house. Bending (stirrups, L-bars, U-bars, standees), hole drilling and similar operations are done by partner fabricators in the valley, then returned to us so the pieces ship with the rest of the order and are tagged with your bar marks.

Included
Reading quantities and lengths from your PDF, confirming any unclear mark by email, cutting, tagging and bundling by mark.
Not included
Shop drawings, detailing, structural calculations, welding, and installation.
What you receive
Tagged bundles matching your bar marks, plus a cut sheet showing what was cut.
Typical timing
Straight cuts 1–2 business days; bending or drilling 3–5 business days.

Phase kitting

One box per phase, labeled before it leaves the dock.

We split your takeoff into phases or areas you define, such as footings, first-floor shearwalls or roof framing, and pack the connectors, anchors, bolts and small hardware for each into its own labeled kit. Kits ship on the dates you set, so the jobsite holds only what the crew is about to use. Cut steel for the same phase can ride on the same truck.

Included
Splitting your takeoff, packing, labeling with job, phase and kit number, and a packing list per kit.
Not included
Doing the takeoff from scratch. We work from your quantities and flag anything that looks short.
What you receive
Labeled kits and a phase-by-phase packing list.
Typical timing
Built 2–3 business days before each phase delivery.

Project supply

A contract price for the job, delivered on the job's schedule.

For mid-sized residential, agricultural and light commercial projects, such as equipment sheds and storage buildings, we quote the full material list by bid or negotiation and sign a supply contract for the schedule. Steel lines carry a price adjustment clause; everything else holds for the term. Fabricated items like metal door and window frames, stairs, handrails and fencing are built to your drawings by partner fabricators and procured through us.

Included
Full-list pricing, a delivery schedule by phase, adjustment terms in writing, and procurement of specified brands or fabricated items.
Not included
Mill-direct truckload trading for large commercial or infrastructure work, design of fabricated items, and installation.
What you receive
Supply contract, delivery calendar, and one invoice per delivery batch.
Typical timing
Quote in 2–4 business days depending on list size; fabricated items 2–4 weeks.

Companion materials

The things that would otherwise send someone to a second counter.

Concrete block and cement products, waterproofing membranes and sealants, and the consumables that steel work eats through: cut-off wheels, welding wire and rod, drill bits and rebar tie wire. They are priced like any other line and loaded with your steel, so one delivery covers the phase.

Included
Stock items on the same order and same truck.
Not included
Lumber, drywall, roofing and finish materials.
What you receive
Line items on your order, delivered with the steel.
Typical timing
Same schedule as the steel they ship with.

The fees behind each service are written down.

Cut fees, kit fees, inventory management and delivery charges are listed on the Rates page, and the order of events from first email to final delivery is on How we work. When you are ready, a PDF and a delivery date are enough to start.